Attach a straight board to the backer board along the line.
How do i tile a shower wall.
If the shower base is uneven tiles will.
You should get the shower wall down to the bare studs.
Preparing the shower for tiles 1.
To start tiling prepare by running a bead of silicone caulk around the perimeter of the area you are tiling to.
Check shower stud walls.
Determine how much tile you ll need.
In our project we brought an old 70s bathroom into classic art deco style.
Put up a sturdy cement.
Rip out any old tile drywall or surrounds that were on the wall.
Measure up 13 the height of one row of tiles plus the grout line and draw a level line.
Add up the wall areas and add 10 so you have extra tile for mistakes or future repairs.
Gut the shower stall down to the studs.
For our shower we chose a running bond pattern.
Begin the bathroom tile installation with the second row up from the bottom.
You ll need a design plan before you start attaching the tile.
If the studs aren t plumb and level the waterproofing won t be either.
Measure each wall area calculating the width times height.
You may need to remove the shower pan and ceiling as well.
Draw a leveled line where the bottom of the second row will fall.
These two lines will guide the initial tile installation.
Do this vertically horizontally and diagonally.
We removed a wall where an old.
Take a 4 foot level and place it across all the studs.
Choose a vapor barrier to install and introduce according to manufacturer directions.
In order to prevent moisture.
Before you do anything it s best to check the stud walls are plumb and level.
Start by turning off the water to the shower so you don t accidentally ruin your work.
Do not put down.
Find and mark the center point on the wall and draw a plumb line as a reference mark.