A typical roof has three layers a felt layer and two layers of overlapping shingles.
How much overlap on shed roofing felt.
Applying new roofing felt to the shed.
Position this strip so that it overhangs the top of the first sheet by 75mm.
03330 112 112 call 24 7.
Fix the overhanging felt using galvanised nails at 50mm.
Allow for felt overhang.
Start at the bottom of the roofline and work up so any water that gets through the roofing material will shed down the tar paper and will not go under it.
For example if the width of your shed is 240 inches 610 cm plus 4 inches 10 cm of overlap mark a line 244 inches 620 cm from the left width of your felt piece.
Roll out the first layer of felt.
Roofing felt also known as tar paper is a roll of felt coverage is often used when constructing a roof.
Buy the roof felt.
Take your second length of felt.
Tack and secure the felt.
Fix the next length of shed felt.
Call 24 7 on.
It has just one layer so it goes.
Purchase a hooked blade which has a small hook extending from a standard blade from a home hardware store.
Hi guys and welcome to my video.
It provides extra waterproofing to protect the wood until shingles are installed.
Where the sheets overlap apply roofing sheet.
After you ve cut the right.
Nail along the top of this strip at 500mm.
One piece is on each side of the roof as well as a third section to overlap the panels on the sides.
2 the process of felting a shed roof.
Add new felt layers.
I had to re felt my shed roof so i though i d share with you the process i went through and the materials i used.
In order to know the appropriate amount of roofing felt to use the roof pitch will need to be calculated first.
Roofing felt is required to overlap 2 inches over the lower felt course.
The overhanging felt over the edge of the roof.
The roofing felt should be applied in layers that overlap.
Clean and prepare the roof.
Keep your shed roof weatherproof all year round.
How to install roll roofing on low slope roofs.
Roll roofing is different.
Free delivery over 50 next day to most of the uk.
Therefore a 2 inch overlap provides redundancy at the edges where the barrier is weakest.
03330 112 112 shop by.
The overlapping felt creates a secondary barrier for moisture and wicks water away from the shingles above and the sheathing below.
When adding roofing felt to your shed you ll need to cut approximately three pieces of felt although though this can vary depending on size.