Do a precise measurement of the surface.
How smooth does a wall need to be before tiling.
You also want to make sure the application and finished wall is as smooth as possible before reapplying the new tile.
To do so make sure all of the tiles are intact and secure.
The tiles must be set before you attempt to grout them or they will move and cause you headaches.
Meanwhile install your floor tiles to the wall.
Vacuum clean and wipe the walls.
Preparing to tile behind the stove.
The first row near the floor should be reserved using a ledger or other space saver.
And then finish by installing that final row of wall tiles so that it overlaps the floor properly.
Remove the tile and prepare the wall according to the corresponding instructions above or tile over the existing tile.
Apply a layer of 1 2 thick cement backer board to the wall.
Backsplash prep beating you up.
First of all removing all the power outlet and light switch wall plates.
Applying a waterproofing sealer to cement backer board before tiling.
If you re tiling the wall doesn t need to be super smooth it just needs to be smooth enough that it won t interfere with the tiles as you site them on into the adhesive.
What you need though is to roughen the wall s surface so the tile adhesive has something to grab onto.
Repair any loose or cracked tiles.
Tile needs a smooth level surface to be installed on.
Grout it clean up and enjoy.
Before getting into the actual prep work there were a couple of things that i had to take care of.
Hey marty you can remove the tile and scrap away the excess mortar.
If existing tiles are beyond repair remove the tile and install a piece of wallboard in its place.
After the wall was smooth it was time to seal the wall a step my handy uncle recommended that i wouldn t have thought about otherwise but made more sense as i didn t want to have anything re wet the joint compound and cause any type of slippage once i applied the tile.
A simple sealer primer did the trick i had plenty left over from.
You can put new thinset on top of old but only if the old thinset is perfectly smooth and level.
Here are the steps involved in preparing tub or shower walls for tile.
What you really want to do is tile the walls starting with the second row and work up from there.
Count how many tiles you ll need.
Follow the package instructions for the tile mastic or thinset used for adhering the tiles to the wall.
The technique of layering means for you to apply one layer of filler and let it dry before you apply the next coat.
This is rarely the case once the old tiles.
Start with planning your wall tile installation.
Since a tile tub or shower surround gets wet it requires a waterproof backing rather than just drywall.
But you may have to repair any scratched or damaged drywall with joint compound.
Prime the surface prior to the tiling.
Tub or shower wall tile preparation.